News

Ne manquez pas les dernières actualisations au sujet des chantiers et des équipements Simex, ainsi que des activités de notre société, telles que foires, évènements et formation produit.
Crushing reinforced concrete directly on site: the CBE 40 experience
Great productivity and reliability for the Simex CBE 40 crusher bucket facing demolition waste with a massive presence of rebar in it. 
NEWS
Simex TFV vertical drum cutter cropping reinforced concrete piles in Genoa construction site
Inside the huge infrastructural project that involves the road and railway traffic in the direction of the former Morandi bridge, a vertical drum cutter cropped more than 600 pile heads in order to expose the reinforcement bars, in preparation of the next phase of the works.
 
NEWS
Crushing demolition waste with a Simex CB 1200
Following the demolition of a farmhouse, the Imola-based construction company Brienza Aurelio found itself having to dispose of huge quantities of bricks, concrete and stones. Thanks to the CB 1200 crusher bucket for skid steer loaders, the work was fast and profitable.
NEWS
Scie à rocher RWE100 à Lucerne
L'entreprise de construction suisse Lötscher Tiefbau Ag réalise d'importants travaux d'agrandissement d'une aile de l'hôpital cantonal de Lucerne. Simex RWE 100 était équipé d'un disque de coupe d'une profondeur de 800 mm et d'une largeur de 130 mm.
NEWS
Quarrying with a TF 1100 in a limestone cave
Extraction of calcium carbonate in quarry: the TF 1100 drum cutter experience.
NEWS
TF 1100 drum cutter - Extraction of calcium carbonate in quarry
A double-drum cutter head employed for calcium carbonate extraction in a quarry in northern Italy.
Video
CBE 30 crusher bucket in Estonia
A CBE 30 crusher bucket was employed for the volumetric reduction of autoclaved aerated concrete (AAC) blocks for the subsequent reintroduction into the production chain.
 
NEWS
PL 100.25 stabilisatrice de sol
L'importance de la stabilisation à la chaux du sol : la SIMEX PL 100.25.
NEWS
Soil stabilization with a Simex PL 100.25
Soil stabilization with lime is a crucial phase for consolidating soil sub-layers before compacting and paving.
Video
Réalisation d’une tranchée pour la pose de conduites de gaz avec une fraise TF 1100
Une fraise à double tambour Simex TF 1100 est utilisée dans la réalisation d’une tranchée pour la pose de conduites de gaz naturel dans la péninsule de Yamal, au nord-ouest de la Sibérie.
NEWS
No-Dig technologies: Simex mini and micro-trenching solutions
Fiber optic networks: Simex at the forefront of the development of new solutions for mini and micro-trenching.
 
NEWS
Scies à rocher Simex RWE 35/RW 350 - Mini tranchée pour la pose de la fibre optique
Une scie à rocher RWE 35/RW 350 permettant de creuser des mini-tranchées spécialement pour la pose de fibre optique.
Video
Sort by: Name Date Size
asso_aemasso_araasso_ara_aedasso_assodimiasso_confindustriaasso_sitebasso_unaceaasso_uniiatt